New phase effective April 26, 2026

Nitaqat Saudization Thresholds — Electricity Generation & Distribution

Four-band Nitaqat thresholds for the Electricity Generation & Distribution sector by headcount

Last updated: 2026-05-01

How Nitaqat works for Electricity Generation & Distribution

This sector uses the Nitaqat Mutawar logarithmic formula:

Required % = MAX(0, m × ln(total_headcount) + c)

Boundarymc
Red upper1.35018.3543
Low Green upper2.60069.3124
Mid Green upper3.000417.1737
High Green upper3.000432.9237

Band thresholds by company headcount

Required Saudization percentages by entity size

HeadcountRedLow GreenMid GreenHigh Green
1011.5%15.3%24.1%39.8%
2512.7%17.7%26.8%42.6%
5013.6%19.5%28.9%44.7%
10014.6%21.3%31.0%46.7%
20015.5%23.1%33.1%48.8%
50016.7%25.5%35.8%51.6%
1,00017.7%27.3%37.9%53.6%

Thresholds change logarithmically with headcount — use the free calculator for exact results.

Sectors in this group (15 activities)

Codes in this group use very similar parameters; pick your exact code in the calculator for its precise result.

ISIC CodeActivity Name
351011Electric power generation
351012Electric power transmission
351013Distribution and retail sale of electric power
351014Distribution and wholesale of electric power
351016Importing and exporting electricity
351017Tendering electricity generation projects, and procuring electricity for the purpose of selling it in bulk
351018Procuring and selling electrical system services
353002Production and distribution of cooled air
353003Production and distribution of chilled water for cooling purposes
360011non-potable water abstraction
360012Water Purification
360013Water desalination
360014water distribution and transfer
360016distribution of treated water
493001Transport of water via pipelines

Track your compliance automatically

Instead of manually computing percentages, sign up free and get your Nitaqat band calculated automatically with proactive alerts.