New phase effective April 26, 2026

Nitaqat Saudization Thresholds — Metal Ore & Mineral Mining

Four-band Nitaqat thresholds for the Metal Ore & Mineral Mining sector by headcount

Last updated: 2026-05-01

How Nitaqat works for Metal Ore & Mineral Mining

This sector uses the Nitaqat Mutawar logarithmic formula:

Required % = MAX(0, m × ln(total_headcount) + c)

Boundarymc
Red upper1.680815.9918
Low Green upper1.869718.9967
Mid Green upper2.080327.9932
High Green upper6.000522.9927
Red upper1.680515.9928
Low Green upper1.869918.9961
Mid Green upper2.080027.9945
High Green upper6.000122.9944

Band thresholds by company headcount

Required Saudization percentages by entity size

HeadcountRedLow GreenMid GreenHigh Green
1019.9%23.3%32.8%36.8%
2521.4%25.0%34.7%42.3%
5022.6%26.3%36.1%46.5%
10023.7%27.6%37.6%50.6%
20024.9%28.9%39.0%54.8%
50026.4%30.6%40.9%60.3%
1,00027.6%31.9%42.4%64.4%

Thresholds change logarithmically with headcount — use the free calculator for exact results.

Sectors in this group (6 activities)

All ISIC4 codes in this activity group share the same Nitaqat formula parameters.

ISIC CodeActivity Name
72901Mining of non-ferrous metal ores, includes (aluminum, copper and lead)
72902Mining of precious metal ores belonging to the gold, silver and platinum set
89101Extraction of natural fertilizers, includes (natural phosphate and natural potassium salts)
89102Mining of metals that contain nitrogen and potassium
89103Mining of sulfur and ores that contain barium
89902Mining and quarrying to obtain precious stones, quartz and mica

Track your compliance automatically

Instead of manually computing percentages, sign up free and get your Nitaqat band calculated automatically with proactive alerts.

Nitaqat Saudization Thresholds — Metal Ore & Mineral Mining | SaudizationMeter